Aktuelle Forschungsprojekte

Image Innovative Manufacturing Technologies for Cryosorption Systems
Image Measurements on ceiling mounted cooling systems
Image Testzentrum PLWP at ILK Dresden
Image Calibration of Low Temperature Sensors
Image Investigation of materials
Image Calibration leak for the water bath leak test
Image Industry 4.0 membrane heat and mass exchanger (i-MWÜ4.0)
Image State of system and failure analyses
Image Air-water heat pumps
Image Software for test rigs
Image Helium extraction from natural gas
Image Low Temperature Measuring Service
Image Characterisation of Superconductors in Hydrogen Atmosphere
Image Development of a Cryogenic Magnetic Air Separation Unit
Image Innovative small helium liquefier
Image Thermal engines

You are here:   /  Home


Development of test methods and test rigs for stationary integrated refrigeration units

BMWi Euronorm Innokom

02/2017 – 07/2019

Andreas Peusch

+49-351-4081-5221

How efficient is my refrigeration unit?

The objective of the R&D project was the development of a test method for stationary integrated refrigeration units. The test method comprises different device variants, like ceiling mounted, wall mounted or split refrigeration units. The method provides reliable performance data and thus enables a manufacturer-independent efficiency comparison.

Measurements in the 3- or 4-chamber measurement setup were carried out using the calorimeter method with compensation of the ambient conditions. This enabled the measurements of devices with low cooling capacity (0.5 - 4 kW).

In the selected test setup (Figure 1), the cooling capacity is measured indirectly via an electrical power of the compensation heating. To determine the total cooling capacity, the heat input into the calorimeter room and, if necessary, internal loads (sensible and latent heat) have to be added together.

The test method comprises following features:

  • Suitable for low temperature devices (-20 °C) and normal temperature cooling (0 °C)
  • Measurement in the calorimeter room (3- or 4-zone concept)
  • Determination of heat input via enclosure surfaces before power measurement
  • Establishment of equilibrium conditions (settling phase) of the temperatures to be set (up to 24 h)
  • Measuring period up to 6 h with permissible tolerance band of 0.2 K

Conclusion:

  • Results were included in new test standard prEN 17432
  • Establishment of a uniform Europe-wide comparison criterion
  • Performance and efficiency data on a uniform basis leads to higher confidence and thus also to lower consumption costs

Your Request

Further Projects

Image

Thermal engines

Power Generation from Waste Heat

Image

Helium extraction from natural gas

Innovative solutions for helium extraction

Image

Ice Slurry Generation

Using Direct Evaporation

Image

Pulse-Tube-Refrigerator with sealed compressor

for mobil use in the hydrogen technology

Image

Low Temperature Measuring Service

Measurement of Thermal Properties at Low Temperatures