Current research projects

Image Air-flow test rig for fan characteristic measurement
Image Air-water heat pumps
Image Industry 4.0 membrane heat and mass exchanger (i-MWÜ4.0)
Image Refrigerants, lubricants and mixtures
Image Testing of mobile leak detectors according to DIN EN 14624
Image Development of a Cryogenic Magnetic Air Separation Unit
Image Investigation according to DIN EN ISO 14903
Image All-in-one device for freeze-drying and production of biomaterial
Image Investigation of materials
Image Laseroptical measurement
Image Tribological investigations of oil-refrigerant-material-systems
Image Software modules
Image Electrical components in refrigeration circuits
Image Behavior of multiphase cryogenic fluids
Image Mass Spectrometer
Image Certifiable connection types in cryogenics

You are here:   /  Home


Development of test methods and test rigs for stationary integrated refrigeration units

BMWi Euronorm Innokom

02/2017 – 07/2019

Andreas Peusch

+49-351-4081-5221

How efficient is my refrigeration unit?

The objective of the R&D project was the development of a test method for stationary integrated refrigeration units. The test method comprises different device variants, like ceiling mounted, wall mounted or split refrigeration units. The method provides reliable performance data and thus enables a manufacturer-independent efficiency comparison.

Measurements in the 3- or 4-chamber measurement setup were carried out using the calorimeter method with compensation of the ambient conditions. This enabled the measurements of devices with low cooling capacity (0.5 - 4 kW).

In the selected test setup (Figure 1), the cooling capacity is measured indirectly via an electrical power of the compensation heating. To determine the total cooling capacity, the heat input into the calorimeter room and, if necessary, internal loads (sensible and latent heat) have to be added together.

The test method comprises following features:

  • Suitable for low temperature devices (-20 °C) and normal temperature cooling (0 °C)
  • Measurement in the calorimeter room (3- or 4-zone concept)
  • Determination of heat input via enclosure surfaces before power measurement
  • Establishment of equilibrium conditions (settling phase) of the temperatures to be set (up to 24 h)
  • Measuring period up to 6 h with permissible tolerance band of 0.2 K

Conclusion:

  • Results were included in new test standard prEN 17432
  • Establishment of a uniform Europe-wide comparison criterion
  • Performance and efficiency data on a uniform basis leads to higher confidence and thus also to lower consumption costs

Your Request

Further Projects

Image

Helium extraction from natural gas

Innovative solutions for helium extraction

Image

Ice Slurry Generation

Using Direct Evaporation

Image

Pulse-Tube-Refrigerator with sealed compressor

for mobil use in the hydrogen technology

Image

Low Temperature Measuring Service

Measurement of Thermal Properties at Low Temperatures

Image

Practical training, diploma, master, bachelor

Student training - Education at ILK