Image Calibration of Low Temperature Sensors
Image Test rigs for refrigeration and heat pump technology
Image Innovative Parahydrogen Generator Based on Magnets
Image Investigation of coolants
Image Brine (water)-water heat pump
Image Hydrogen and methane testing field at the ILK
Image 3D - Air flow sensor
Image Multifunctional electronic modules for cryogenic applications
Image Air-water heat pumps
Image Air-flow test rig for fan characteristic measurement
Image Helium extraction from natural gas
Image Range of services laboratory analyses
Image Cryostats, Non-Metallic and Metallic
Image Combined building and system simulation
Image Performance tests of refrigerant compressors
Image Preformance measurements of heat exchangers

You are here:   /  Home


Development of test methods and test rigs for stationary integrated refrigeration units

BMWi Euronorm Innokom

02/2017 – 07/2019

Andreas Peusch

+49-351-4081-639

How efficient is my refrigeration unit?

The objective of the R&D project was the development of a test method for stationary integrated refrigeration units. The test method comprises different device variants, like ceiling mounted, wall mounted or split refrigeration units. The method provides reliable performance data and thus enables a manufacturer-independent efficiency comparison.

Measurements in the 3- or 4-chamber measuring set-up were carried out using the calorimeter method with compensation of the ambient conditions. This enabled the measurements of devices with low cooling capacity (0.5 - 4 kW).

In the selected test set-up (Figure 1), the cooling capacity is measured indirectly via the electrical power of the compensation heating. To determine the total cooling capacity, the heat input into the calorimeter room and, if necessary, internal loads (sensible and latent heat) must be added together.

The test method comprises following features:

  • suitable for low temperature devices (-20°C) and normal temperature cooling
  • measurement in calorimeter room (3- or 4-chamber concept)
  • determination of heat input via enclosing surfaces before power measurement
  • establishiment of equilibrium states of the temperatures to be set (takes up to 24h)
  • measurement period up to 6h at a tolerance band of 0,2K

Conclusion:

  • results are implemented into the new test norm prEN 17432
  • establishment of an uniform Europe-wide comparison criterion
  • performance and efficiency data on a uniform basis leads to higher confidence and thus also to lower consumption costs

Your Request

Further Projects

Image

Electrochemical decontamination of electrically conducting surfaces „EDeKo II“

Improvement of sanitary prevention by electrochemical decontamination

Image

Electrical components in refrigeration circuits

High voltage tests under real conditions

Image

Influenced melting point of water by magnetic field

Controlled sub-cooling of products in freezing processes

Image

Investigation of materials

Investigations regarding the compatibility of materials with refrigerants, oils and heat transfer fluids


Contact

Institut für Luft- und Kältetechnik - Gemeinnützige Gesellschaft mbH
Bertolt-Brecht-Allee 20, 01309 Dresden


Secretary to the Management

+49-351-4081-520

+49-351-4081-525

Image ISO 9001
Bild Zuse Mitglied Bild SIG