Current research projects

Image Development of test methods and test rigs for stationary integrated refrigeration units
Image Panel with indirect evaporative cooling via membrane
Image Air-water heat pumps
Image Test rigs for refrigeration and heat pump technology
Image Filter Tests
Image Behavior of multiphase cryogenic fluids
Image Certification of efficient air conditioning and ventilation systems through the new "indoor air quality seal" for non-residential buildings
Image Performance tests of refrigerant compressors
Image Investigation of material-dependent parameters
Image Cool Up
Image Helium extraction from natural gas
Image Mass Spectrometer
Image Investigation according to DIN EN ISO 14903
Image Preformance measurements of heat exchangers
Image Innovative Parahydrogen Generator Based on Magnets
Image Industry 4.0 membrane heat and mass exchanger (i-MWÜ4.0)

You are here:  Home /  Research and Development


Innovative small helium liquefier

EuroNorm GmbH (BMWi)

Dr. Erik Neuber

+49-351-4081-5122

Liquefaction rates from 10 to 15 l/h

The goal of the R & D project is to explore new innovative ways to develop the functional model of a "helium liquefier for the small liquefaction rate". The development of such a system should cover the still non-existent area of the market.

 

This liquefier should contain several innovations and technical solutions:

  • Development of a helium liquefaction system with a liquefaction rate of 10 - 15 liters per hour of liquid helium.
  • Development of an innovative pre-cooling stage, which works with a mixture of helium and refrigerants as working fluid.
  • Detailed investigation of an innovative helium cycle within the development of the helium small liquefier with the ability to operate in different operating regimes: helium liquefaction, cooling and temperature stabilization/control.
  • Operation of the condenser with a liquefaction rate that can be varied over a wide range - between 75% and 100%.

Currently, the functional design of the helium small liquefier is being set up. The figure shows a 3D model of the cold box, in which all heat exchangers and cold valves are mounted. In the upper part of the cold box, two prototypes of low flow helium turboexpanders are mounted. All external components, piping and condenser control system are located on the front of the cold box.


Your Request

Further Projects - Research and Development

Image

Low Temperature Measuring Service

Measurement of Thermal Properties at Low Temperatures