Current research projects

Image Computational fluid dynamics CFD
Image Swirl-free on the move...
Image Innovative small helium liquefier
Image Testing of mobile leak detectors according to DIN EN 14624
Image Micro heat exchangers in refrigeration
Image Optimizing HVAC operation with machine learning
Image Behavior of multiphase cryogenic fluids
Image Influenced melting point of water by magnetic field
Image Reducing the filling quantity
Image Certification of efficient air conditioning and ventilation systems through the new "indoor air quality seal" for non-residential buildings
Image State of system and failure analyses
Image CFE-Test of Cooker Hoods
Image Test rigs for refrigeration and heat pump technology
Image High Capacity Pulse Tube Cooler
Image Preformance measurements of heat exchangers
Image Measurements on ceiling mounted cooling systems

You are here:   /  Home


Innovative small helium liquefier

EuroNorm GmbH (BMWi)

Dr. Erik Neuber

+49-351-4081-5122

Liquefaction rates from 10 to 15 l/h

The goal of the R & D project is to explore new innovative ways to develop the functional model of a "helium liquefier for the small liquefaction rate". The development of such a system should cover the still non-existent area of the market.

 

This liquefier should contain several innovations and technical solutions:

  • Development of a helium liquefaction system with a liquefaction rate of 10 - 15 liters per hour of liquid helium.
  • Development of an innovative pre-cooling stage, which works with a mixture of helium and refrigerants as working fluid.
  • Detailed investigation of an innovative helium cycle within the development of the helium small liquefier with the ability to operate in different operating regimes: helium liquefaction, cooling and temperature stabilization/control.
  • Operation of the condenser with a liquefaction rate that can be varied over a wide range - between 75% and 100%.

Currently, the functional design of the helium small liquefier is being set up. The figure shows a 3D model of the cold box, in which all heat exchangers and cold valves are mounted. In the upper part of the cold box, two prototypes of low flow helium turboexpanders are mounted. All external components, piping and condenser control system are located on the front of the cold box.


Your Request

Further Projects

Image

Filter Tests

INDUSTRIAL AND LABORATORY PRECIPITATORS

Image

Low Temperature Tribology

Tribological studies at cryogenic temperatures

Image

Investigation of coolants

Secondary loop refrigerants

Image

Refrigerants, lubricants and mixtures

Determination of working fluid properties