Current research projects

Image Cold meter
Image Investigation according to DIN EN ISO 14903
Image Investigation of material-dependent parameters
Image Air-flow test rig for fan characteristic measurement
Image Measurement of insulated packaging
Image Ice Slurry Generation
Image Test rigs for refrigeration and heat pump technology
Image Influenced melting point of water by magnetic field
Image Refrigerants, lubricants and mixtures
Image Micro heat exchangers in refrigeration
Image Tensile and compression testing
Image Investigation of materials
Image Overall System Optimization of Refrigeration Plant Systems for Energy Transition and Climate Protection
Image Performance tests of condensing units
Image Thermal engines
Image Corrosion inhibitor for ammonia absorption systems

You are here:  Home /  Testing Equipment


Innovative small helium liquefier

EuroNorm GmbH (BMWi)

Dr. Erik Neuber

+49-351-4081-5122

Liquefaction rates from 10 to 15 l/h

The goal of the R & D project is to explore new innovative ways to develop the functional model of a "helium liquefier for the small liquefaction rate". The development of such a system should cover the still non-existent area of the market.

 

This liquefier should contain several innovations and technical solutions:

  • Development of a helium liquefaction system with a liquefaction rate of 10 - 15 liters per hour of liquid helium.
  • Development of an innovative pre-cooling stage, which works with a mixture of helium and refrigerants as working fluid.
  • Detailed investigation of an innovative helium cycle within the development of the helium small liquefier with the ability to operate in different operating regimes: helium liquefaction, cooling and temperature stabilization/control.
  • Operation of the condenser with a liquefaction rate that can be varied over a wide range - between 75% and 100%.

Currently, the functional design of the helium small liquefier is being set up. The figure shows a 3D model of the cold box, in which all heat exchangers and cold valves are mounted. In the upper part of the cold box, two prototypes of low flow helium turboexpanders are mounted. All external components, piping and condenser control system are located on the front of the cold box.


Your Request

Further Projects - Testing Equipment

Image

Low temperature – test facilities

thermal cycling tests at very low temperatures

Image

All-in-one device for freeze-drying and production of biomaterial

with automated freezing and sterilisation option

Image

Corrosion inhibitor for ammonia absorption systems

An alternative to chromium(VI) compounds

Image

High temperature heat pump

Using waste heat from industrial processes