Aktuelle Forschungsprojekte

Image Performance tests of refrigerant compressors
Image Software for test rigs
Image Swirl-free on the move...
Image Innovative cryogenic cooling system for the recondensation / liquefaction of technical gases up to 77 K
Image Industry 4.0 membrane heat and mass exchanger (i-MWÜ4.0)
Image 3D - Air flow sensor
Image Micro fluidic expansion valve
Image Service offer for Leak Detection and Tightness Test
Image Lifetime prediction of hermetic compressor systems
Image High Capacity Pulse Tube Cooler
Image Intelligent innovative power supply for superconducting coils
Image Air-flow test rig for fan characteristic measurement
Image Practical training, diploma, master, bachelor
Image Behavior of multiphase cryogenic fluids
Image Electrical components in refrigeration circuits
Image Helium extraction from natural gas

You are here:   /  Home


Development of test methods and test rigs for stationary integrated refrigeration units

BMWi Euronorm Innokom

02/2017 – 07/2019

Andreas Peusch

+49-351-4081-5221

How efficient is my refrigeration unit?

The objective of the R&D project was the development of a test method for stationary integrated refrigeration units. The test method comprises different device variants, like ceiling mounted, wall mounted or split refrigeration units. The method provides reliable performance data and thus enables a manufacturer-independent efficiency comparison.

Measurements in the 3- or 4-chamber measurement setup were carried out using the calorimeter method with compensation of the ambient conditions. This enabled the measurements of devices with low cooling capacity (0.5 - 4 kW).

In the selected test setup (Figure 1), the cooling capacity is measured indirectly via an electrical power of the compensation heating. To determine the total cooling capacity, the heat input into the calorimeter room and, if necessary, internal loads (sensible and latent heat) have to be added together.

The test method comprises following features:

  • Suitable for low temperature devices (-20 °C) and normal temperature cooling (0 °C)
  • Measurement in the calorimeter room (3- or 4-zone concept)
  • Determination of heat input via enclosure surfaces before power measurement
  • Establishment of equilibrium conditions (settling phase) of the temperatures to be set (up to 24 h)
  • Measuring period up to 6 h with permissible tolerance band of 0.2 K

Conclusion:

  • Results were included in new test standard prEN 17432
  • Establishment of a uniform Europe-wide comparison criterion
  • Performance and efficiency data on a uniform basis leads to higher confidence and thus also to lower consumption costs

Your Request

Further Projects