Aktuelle Forschungsprojekte

Image Filter Tests
Image Influenced melting point of water by magnetic field
Image Panel with indirect evaporative cooling via membrane
Image Low noise and non metallic liquid-helium cryostat
Image Non- invasive flow measurements
Image Practical training, diploma, master, bachelor
Image Lifetime prediction of hermetic compressor systems
Image Helium extraction from natural gas
Image Cool Up
Image Innovative Parahydrogen Generator Based on Magnets
Image Test procedures for electrical components
Image Laseroptical measurement
Image Pulse-Tube-Refrigerator with sealed compressor
Image Ionocaloric cooling
Image Air-flow test rig for fan characteristic measurement
Image Tribological investigations of oil-refrigerant-material-systems

You are here:   /  Home


Development of test methods and test rigs for stationary integrated refrigeration units

6050

The objective of the R&D project was the development of a test method for stationary integrated refrigeration units. The test method comprises different device variants, like ceiling mounted, wall mounted or split refrigeration units. The method provides reliable performance data and thus enables a manufacturer-independent efficiency comparison.

Measurements in the 3- or 4-chamber measurement setup were carried out using the calorimeter method with compensation of the ambient conditions. This enabled the measurements of devices with low cooling capacity (0.5 - 4 kW).

In the selected test setup (Figure 1), the cooling capacity is measured indirectly via an electrical power of the compensation heating. To determine the total cooling capacity, the heat input into the calorimeter room and, if necessary, internal loads (sensible and latent heat) have to be added together.

The test method comprises following features:

  • Suitable for low temperature devices (-20 °C) and normal temperature cooling (0 °C)
  • Measurement in the calorimeter room (3- or 4-zone concept)
  • Determination of heat input via enclosure surfaces before power measurement
  • Establishment of equilibrium conditions (settling phase) of the temperatures to be set (up to 24 h)
  • Measuring period up to 6 h with permissible tolerance band of 0.2 K

Conclusion:

  • Results were included in new test standard prEN 17432
  • Establishment of a uniform Europe-wide comparison criterion
  • Performance and efficiency data on a uniform basis leads to higher confidence and thus also to lower consumption costs