Current research projects

Image Practical training, diploma, master, bachelor
Image Overall System Optimization of Refrigeration Plant Systems for Energy Transition and Climate Protection
Image Intelligent innovative power supply for superconducting coils
Image Non- invasive flow measurements
Image ZeroHeatPump
Image Brine (water)-water heat pump
Image Air-flow test rig for fan characteristic measurement
Image Development of a Cryogenic Magnetic Air Separation Unit
Image Performance tests of refrigerant compressors
Image Test procedures for electrical components
Image Performance tests of condensing units
Image Software modules
Image Test method for high - temperature heat pump - oils
Image Investigation according to DIN EN ISO 14903
Image Filter Tests
Image Helium extraction from natural gas

You are here:  Home /  Research and Development


Development of test methods and test rigs for stationary integrated refrigeration units

BMWi Euronorm Innokom

02/2017 – 07/2019

Andreas Peusch

+49-351-4081-5221

How efficient is my refrigeration unit?

The objective of the R&D project was the development of a test method for stationary integrated refrigeration units. The test method comprises different device variants, like ceiling mounted, wall mounted or split refrigeration units. The method provides reliable performance data and thus enables a manufacturer-independent efficiency comparison.

Measurements in the 3- or 4-chamber measurement setup were carried out using the calorimeter method with compensation of the ambient conditions. This enabled the measurements of devices with low cooling capacity (0.5 - 4 kW).

In the selected test setup (Figure 1), the cooling capacity is measured indirectly via an electrical power of the compensation heating. To determine the total cooling capacity, the heat input into the calorimeter room and, if necessary, internal loads (sensible and latent heat) have to be added together.

The test method comprises following features:

  • Suitable for low temperature devices (-20 °C) and normal temperature cooling (0 °C)
  • Measurement in the calorimeter room (3- or 4-zone concept)
  • Determination of heat input via enclosure surfaces before power measurement
  • Establishment of equilibrium conditions (settling phase) of the temperatures to be set (up to 24 h)
  • Measuring period up to 6 h with permissible tolerance band of 0.2 K

Conclusion:

  • Results were included in new test standard prEN 17432
  • Establishment of a uniform Europe-wide comparison criterion
  • Performance and efficiency data on a uniform basis leads to higher confidence and thus also to lower consumption costs

Your Request

Further Projects - Research and Development

Image

Laseroptical measurement

PIV and LDA / PDA

Image

Multifunctional electronic modules for cryogenic applications

Electronic with less wiring effort - more than 100 sensors via one feedthrough

Image

Certifiable connection types in cryogenics

Detachable and permanent connections, adhesive bond / form closure / force closure

Image

Combined building and system simulation

Scientific analysis of thermodynamic processes in buildings and its systems

Image

Heat2Power

Refining of fuel cell waste heat